How would you like to start?
✓
Schematic Design
Describe the project in plain language — building type, SF, HVAC system, and ASHRAE edition. Get an instant VRP vs IAQp estimate.
Quick estimate
✓
VRP vs IAQp Calculations
Full zone-by-zone analysis with spreadsheet upload, AI floor plan intake, or manual entry. Generates PDF, Excel, and submittal packages.
Full calculation
Describe your project
Include: building type and primary use, total square footage, HVAC system type, total supply air CFM, and which ASHRAE 62.1 edition applies. The more detail you provide, the more accurate the estimate.
Example description
"5-story Class A office building in downtown Chicago, approximately 120,000 SF total. The mechanical system is a central VAV system with dedicated outdoor air units (DOAUs) serving each floor. Total supply air capacity is 140,000 CFM across all floors. The project is targeting ASHRAE 62.1-2022 compliance."
Minimum 50 characters
Parsing description and running ASHRAE calculations…
IAQp Schematic Analysis — AtmosAir Solutions
VRP Baseline OA Required
—CFM
CO₂ Dilution Floor (≤2,000 ppm — DCV eliminated)
—CFM
IAQp OA Range (AtmosAir)
—CFM
| AtmosAir Technology | IAQp OA (CFM) | OA Savings | Reduction |
|---|
Schematic-level estimate. IAQp minimum OA is the binding constraint of three checks: (1) HCHO mass balance with AtmosAir filtration credit, (2) CO₂ dilution at 2,000 ppm with no filtration credit, and (3) PM₂.₅ mass balance with AtmosAir filtration credit (DBD+HEPA achieves HEPA-grade PM₂.₅ removal). Contaminant levels shown are steady-state predictions. CO₂ analysis assumes DCV is eliminated — constant OA. NIOSH occupational CO₂ reference 5,000 ppm (submarine cognitive study). Outdoor PM₂.₅ assumed 10 µg/m³ (US urban average). Building-type averages from ASHRAE 62.1 Table 6-1; single-zone model.
Step 1
Choose your unit system
All calculations and export outputs will use the selected units throughout.
✓
IP — US Customary
Square feet, cubic feet per minute, Fahrenheit. Standard for US projects.
US / Americas
✓
SI — Metric
Square metres, litres per second, Celsius. Standard for international and Canadian projects.
International / Canada / EU
Step 2
Select ASHRAE 62.1 edition
The edition determines whether Table 6-5 design limits and the Em mixture compliance check apply, or whether performance-based reference concentrations govern.
2025
Prescriptive
Table 6-5 limits + Em mixture index. Current edition.
2022
Prescriptive
Table 6-5 + Table 6-6. Referenced by 2025 MCNYS / 2024 IMC.
2019 + aa
Prescriptive
Addendum aa (Jan 2022) added Table 6-5 and §7.3 verification.
2019
Performance
No design limits. Engineer selects cognizant authority limits.
2016
Performance
Performance-based. Zpz check (Appendix A) may apply.
2013
Performance
Performance-based. No altitude correction.
2010
Performance
Gym/sports arena Rp/Ra override. Zpz Table check applies.
Prescriptive — Table 6-5 limits enforced; Em < 1.0 mixture compliance required (§7.3)
Performance-based — concentrations shown as reference; engineer documents cognizant authority limits
Step 3
How will you enter project data?
You can switch methods at any time inside the calculator.
Manual entry
Add AHUs, zones, and spaces directly. Best for new projects or small zone counts.
Always available
Upload spreadsheet
Drag-and-drop an existing AtmosAir .xlsm or .xlsx zone data workbook to import.
Both IP & SI
Coming Soon
Upload floor plan
Drop a PNG, JPG, or PDF floor plan — AI extracts zones, spaces, and CFM estimates.
IP units only
Load saved project
Load a previously saved .json project file to continue where you left off.
IP units only
IP — ft² / CFM ·
ASHRAE 62.1-2025 ·
Manual entry
Open IP Calculator →